Project

Sunset Drive Primary & Hallway Bathroom Remodels

A bathroom leak prompted this homeowner to move forward with renovations she had been considering for some time. She wanted to update the finishes, improve the layouts, and make better use of the space in both bathrooms.

The primary bathroom underwent a complete renovation. Removing the original enclosed shower opened up the room, allowing for a longer vanity with two sinks. At the opposite end, the existing bathtub was replaced with a spacious walk in shower featuring updated tile and fixtures.

Bathroom with a glass-enclosed tiled shower, wood vanity, built-in bathtub, and beige tile flooring.
Before
Remodeled bathroom featuring a double-sink wood vanity, quartz countertops, frameless glass walk-in shower, and gray tile flooring.
After
Remodeled bathroom featuring a double-sink wood vanity, quartz countertops, frameless glass walk-in shower, and gray tile flooring.

Have a project in mind?

Tell us what you'd like to accomplish. Jason will review the details and follow up to discuss your project.